Hi,
I would like to create a graph based on a svg image (an elephant). For example, if score is 70%, I would like to make my elephant 70% filled with red from the bottom to the top.
My elephant is 100% gray, so most likely I have mistakes in my measure.
The elephant is an icon I found in PowerPoint and saved as svg. I attached the code for the svg image formatted for PowerBI in the “elephant for svg measures.txt” document. I also attached the sample pbix file.
Thanks!
svg elephant graph.pbix (208.3 KB)
elephant for svg measures.txt (2.9 KB)