I don’t know if this possible. I have the following Dates:
Opp loaded date
Quote ready date
SubmittedToFeasibility
LastFeasibilityResult
CustomerSignedQuote/POLoadedDate
QuoteConversionDate
ATP Date
Billing Date
I want a visualisation that will look take the Dates when those events happened and Plot when those events occured. So something to see how long it took for the full cycle to be completed. is There such a visual. I have used the Funnel to show how long it took, however it is not ideal. I was thinking along the lines of a Line Graph or a Pipeline. We want to see how long the sales cycle took .
Hello @SammiP, we noticed that no response was received from you on the post above. In case there won’t be any activity on it in the next few days, we’ll be tagging this post as Solved.